ITEP: GE Defends Its Helicopter Engine
Posted on
Leaked extracts from an Army review tell only part of the story, a 12-year saga of extensive research, development, and testing, the company argues.
ATEC Appeals To Hill For Helicopter Engine Dough
Posted on
Rebuffed by the Army and GAO in its bid to re-engine aging helicopters, ATEC has gone over their heads to Congress and asked legislators for a second chance.
FARA: Army Awards 5 Design Contracts; Winner Enters Production in 2028
Posted on
Awards for Future Attack Reconnaissance Aircraft designs went to Bell, Boeing, Karem, Sikorsky, and a partnership of AVX and L-3.
GE’s ITEP Win & The Army’s Inch-By-Inch Revolution
Posted on
Having wasted tens of billions and almost 30 years since the end of the Cold War, the Army is out of time. But after decades of incremental improvements, its existing weapons — including the UH-60 Black Hawk helicopter that GE’s new engine will upgrade – are overweight, underpowered, and running out of room to grow. Meanwhile, the Army’s attempts at a high-tech great leap forward kept getting cancelled as unaffordable, unfeasible, or both.
12 Moments Of Truth For Army Modernization In 2019
Posted on
WASHINGTON: At least a dozen major Army weapons programs face big decisions in 2019. The service will launch a competition for new armored vehicles; award development contracts for scout aircraft and helicopter engines; conduct key tests of long-range missiles, anti-aircraft defenses, rifles, targeting goggles, and multiple battlefield networks; and field new electronics for command posts.
Kill Army Helo Upgrades & Build Super Chopper: Bell V-280 Exec
Posted on
AMARILLO, TEX.: Bell Helicopter is so confident in their new V-280 tilt-rotor prototype that they want the Pentagon to accelerate the Future Vertical Lift program – which they think the V-280 will win – by “five to eight years.” [Click here for our head-to-head comparison of the V-280 and its rival, the Sikorsky-Boeing SB>1] That… Keep reading →
Why America Really Needs ITEP Engines
Posted on
With the Association of the US Army’s annual conference starting Monday, there is no better time for an analysis of the top modernization program for Army aviation. And we’ve got one of the top experts on helicopters providing the commentary, Mike Hirschberg of the American Helicopter Society International. Should the Army plow ahead with an engine upgrade… Keep reading →
Big SPAR Army Review May Topple ITEP
Posted on
Critics say the Army could end up wasting billions by developing a better engine for its Sikorsky UH-60 Black Hawk and Boeing AH-64 Apache helicopters even as the joint Future Vertical Lift (FVL) initiative gets underway to replace those aircraft. The critics are wrong, program officials assure us. But the critics still disagree. A new Army… Keep reading →
Another Baby Step For Army Aviation’s ‘Top Priority’
Posted on
Army aviation’s “top modernization priority program” – at least that’s what they call it – took another baby step forward this week. The service awarded preliminary design review contracts to the two competitors vying to build a better engine to power the service’s vast fleet of Sikorsky UH-60 Black Hawk and Boeing AH-64 Apache helicopters.… Keep reading →
Buy A New Helo Engine? The Army Thinks It Can, Thinks It Can…
Posted on
After more than seven years of designing and testing how to make new, more powerful, and incredibly fuel efficient engines for its AH-64 Apache attack helicopters and UH-60 Black Hawk utility birds, the Army has issued a Request for Proposals (RFP). The Army’s “top aviation priority” thus takes a baby step closer to becoming a… Keep reading →